Project Introduction of Customised Pigsty in Heilongjiang, China
The customised pigsty project in Heilongjiang, China is a significant undertaking. The main structure of this overall steel structure project is provided by our company, Huahengyuan Steel Structure. The project started on August 13, 2024, and is scheduled to end on October 13, 2024.
The overall project is divided into three stages. As of now, the first stage has been completed. The subsequent stages will await the warming of the weather in the north to continue the installation work. The entire structure is galvanized and transported to the site by land.
Our warehouse and cattle shed project is also advancing smoothly. As of now, it has been completed and dispatched to the site. The entire project employs a galvanizing process. The first batch of goods will arrive punctually after galvanization. Currently, a total of 300 tons of cargo have been received at the project site, including 200 tons of warehouses and over 100 tons of cattle sheds. This project will continue until mid-next year. However, due to weather conditions, operations will be suspended in November and resume in March 2025. After all, a temperature of minus 20 degrees Celsius poses significant challenges to the project.
Simultaneously, our municipal project has also been implemented. We have contracted a heating pipeline laying project. The pipelines are currently under production, and a batch has been sent to the site for welding and installation. This project will last for two months. Soon, we will receive photos returned from the site cause next week, quality inspector will conduct quality inspections on the first part of the project.
Efforts of Huahengyuan Steel Structure Company
Huahengyuan Steel Structure has made great efforts in this project. We carefully selected high-quality steel materials to ensure the strength and durability of the pigsty’s main structure. Our experienced engineering team designed and fabricated the structure with precision, adhering to strict quality standards.
During the first stage, our installation team worked efficiently and safely to complete the initial part of the project. We closely coordinated with the client to address any concerns and ensure that the work was carried out smoothly.
As we await the opportune time for the next stages, we are constantly monitoring the weather conditions and preparing for a seamless continuation of the installation. We are committed to delivering a high-quality pigsty that meets the specific needs of our client and provides a safe and comfortable environment for the pigs.